KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  2-11-2013
Number of Hours:  2.00
Manual Reference:  Page 8-4
Brief Description:  Landing gear box assembly #3

Spent the day flying a C-170 on skiis in the Muskoka Lake region and flew into Lake Muskoka and had lunch at Boston Pizza. Good times!

After the family went to bed, I manged to get into the garage and did a little work.

Used some .040 Alclad T3 2024 and used the previous templates for the left and right boxes, traced, rough cut, and then cleaned up on the scotchbrite wheel.

Once deburred, I landmark the top and bottom nutplate holes, drilled and then clecoed to the F-802C's.

I then matched drilled eack hole, clecoing along the way.

Gear towers are complete, not I just have to get ready to prime.
' style=

Template, rough cut to finished product

Template, rough cut to finished product

' style=

Left tower done

Left tower done

' style=

Right tower done.

Right tower done.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.